Epping to Thornleigh Third Track

Epping to Thornleigh Third Track

CPB Contractors utilised AusDilaps to conduct an array of dilapidation reports for the Epping to Thornleigh Third Track project. The project was in place to upgrade the Northern Sydney Freight Corridor Program. The new track separates northbound freight trains from all-stops passenger trains along the steep incline between Epping and Thornleigh.

  • Client

    CPB Contractors, Transport for NSW JV

  • Year Completed

    2017

  • Location

    Epping through to Thornleigh

  • Value total ($)

    411 Million

  • Quantity

    110 properties

The now-complete project saw the construction of six kilometres of new and upgraded track on the western side of the existing tracks. AusDilaps we’re able to be involved in a major infrastructure project for NSW that would assist in the much-needed transportation of freight between Sydney and Newcastle. AusDilaps scope of work was to carry out inspection and reports on 110 properties as well as post construction inspections and forensic defect reports. We are delighted to have been able to conduct dilapidation reports for CPB Contractors.

Need Expert Advice? Talk to us today!

  • This field is for validation purposes and should be left unchanged.